Financial Analysis of the Business Case for an Affordability Environmental Impact Bond
Abstract
Public water utilities are challenged with maintaining affordable rate structures
while facing increasingly strict regulatory requirements and rising operational, maintenance,
and energy costs. Increased costs may be passed through to water rate payers through
higher water bills that can create issues of water affordability for low-income customers
and negative financial and reputational impacts for water utilities if bills remain
unpaid.
Environmental Impact Bonds (EIBs) are highly regarded by impact investors due to innovative
built-in outcome metrics that provide social and environmental benefits and financial
returns. The Nicholas Institute of Environmental Policy Solutions (NIEPS) and outcome-based
capital firm Quantified Ventures are investigating the structure and deployment of
an Affordability Environmental Impact Bond (Affordability-EIB) that could both lower
the burden of water bills on low-income customers through water affordability programs,
and attract investors interested in green capital and social outcomes. Affordability
outcomes of an Affordability-EIB bond would be evaluated using metrics of household
affordability created by the Water Policy team at NIEPS.
Energy costs contribute up to 40% of the operating costs of water utilities and present
an opportunity for a water utility to monetize cost savings through investment in
energy efficiency technologies. A financial model was developed to evaluate the business
case and potential cost savings at water and wastewater treatment plants from accelerating
energy efficiency system upgrades funded by an Affordability-EIB. The model incorporates
financial, operational, and environmental variables and analyzes cost of the accelerated
system upgrades to costs of a base case with and without a future upgrade. Annual
cost savings, cumulative savings over the evaluation period, discounted annual cost
savings, and the net present value of cost savings are calculated for four financial
settings:
• Annual cost without the cost of debt service
• Annual costs with the cost of debt service
• Capitalization of the social cost of carbon
• Annual costs with the cost of debt service and capitalization of the social cost
of carbon.
Observed capital costs, and electricity use and price from an aeration system upgrade
at the North Toronto Wastewater Treatment Plan were input in the Affordability-EIB
model to evaluate cost savings from an accelerated system upgrade. The accelerated
system upgrade modeled on the Toronto case study did not demonstrate a positive business
case when compared to a base case without a system upgrade because the cost of debt
service was greater than electricity cost savings. The accelerated system upgrade
did demonstrate a positive business case when compared to a base case with a future
system upgrade. A Monte Carlo outcome probability simulation for the NPV of net cost
savings with the cost of debt service comparing the accelerated system upgrade to
the base case with future upgrade was performed. The simulation determined that operational
variables, particularly electricity reduction from the accelerated system upgrade,
contributed most to the variance of NPV of cost savings.
The simplified Affordability-EIB model is limited by its inability to incorporate
factors including the complicated nature of water and wastewater systems, operations
and maintenance costs, electricity demand, and complex utility billing structures.
The biggest limitation of the model is the engrained assumption that water utilities
are rationally economic actors. Instead, water utilities make decisions to meet regulatory
compliance and ensure customer health instead of prioritizing maximum operational
and economic efficiency.
The positive business case for investment in energy efficiency technologies through
an Affordability-EIB would be strengthened by sourcing and evaluating case studies
across a variety of energy efficiency technologies and water systems to demonstrate
positive cost savings and identify further sensitives within the model. Notwithstanding,
the considerable number of financial, operational, and environmental variables within
the Affordability-EIB model make it a flexible tool to demonstrate how positive net
cost savings can be generated through accelerated system modernization while incorporating
municipal and investor preferences through an Affordability-EIB.
Type
Master's projectDepartment
Nicholas School of the EnvironmentPermalink
https://hdl.handle.net/10161/24896Citation
Braun, Amanda (2022). Financial Analysis of the Business Case for an Affordability Environmental Impact
Bond. Master's project, Duke University. Retrieved from https://hdl.handle.net/10161/24896.Collections
More Info
Show full item record
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 3.0 United States License.
Rights for Collection: Nicholas School of the Environment
Works are deposited here by their authors, and represent their research and opinions, not that of Duke University. Some materials and descriptions may include offensive content. More info