Alternatives to Doing a Dam Thing
Date
2014-04-25
Advisors
Journal Title
Journal ISSN
Volume Title
Repository Usage Stats
views
downloads
Abstract
Population projections for the City of Raleigh, NC indicate a shortfall in long-term raw water supply requirements given current service area demands. Raleigh is proposing the development of a new reservoir to meet midterm needs; however, the reservoir is a costly project with relatively short-term returns and is an environmentally sub-optimal solution. This report proposes four unique adaptive management options to Raleigh’s existing reservoir, Falls Lake, as alternatives to a new reservoir: Permanent flood control pool reallocation, dynamic reservoir management, permanent sedimentation pool reallocation and guide curve flexibility. Considering system risk, costs, ability to generate additional water supply and environmental impacts, we recommend the combination of sedimentation pool reallocation and a flexible guide curve be explored to increase the city’s water supply allocation from Falls Lake. Current static management of water supply sources is ill equipped to adapt to dynamic climatic conditions and human development which may lead to increased risk and vulnerability for the communities that rely on similar reservoirs for municipal water supply and flood control
Type
Description
Provenance
Subjects
Citation
Permalink
Citation
Kostiuk, Kevin, Mike Mangiante and Apple Loveless (2014). Alternatives to Doing a Dam Thing. Master's project, Duke University. Retrieved from https://hdl.handle.net/10161/8557.
Collections
Except where otherwise noted, student scholarship that was shared on DukeSpace after 2009 is made available to the public under a Creative Commons Attribution / Non-commercial / No derivatives (CC-BY-NC-ND) license. All rights in student work shared on DukeSpace before 2009 remain with the author and/or their designee, whose permission may be required for reuse.