Flexible Interconnection: A Policy Solution to Meet U.S. Energy and Climate Needs

dc.contributor.advisor

Murray, Brian

dc.contributor.author

Angermeier, Bonnie

dc.date.accessioned

2026-04-21T18:15:58Z

dc.date.available

2026-04-21T18:15:58Z

dc.date.issued

2026-04

dc.department

Nicholas School of the Environment

dc.description.abstract

Addressing the climate crisis while meeting rising energy demand will require the rapid scaling of renewable generation in the United States. Currently, extreme interconnection queue delays pose a significant barrier to utility-scale clean energy development. The Electric Reliability Council of Texas (ERCOT) offers a compelling model – “Connect-and Manage” (C&M) – that enables faster interconnection, substantial renewable integration, and proactive grid planning. This paper explores the functionality of this approach and its benefits – such as enhanced grid reliability, reduced project and upgrade costs, lower energy bills, job creation, and decreased emissions. Building on these insights, the analysis proposes federal policy to direct FERC to prescribe a flexible interconnection offering across jurisdictional entities, supported by a DOE data gathering requirement to enhance interconnection transparency and transmission planning. This paper presents the case for bipartisan support of this flexible interconnection policy, accompanied by an assessment of viable Congressional champions, and includes a robust appendix containing a FAQ resource, draft legislation, an examination of supporting stakeholders, and a policy factsheet for lawmakers.

dc.identifier.uri

https://hdl.handle.net/10161/34438

dc.language.iso

en_US

dc.rights.uri

https://creativecommons.org/licenses/by-nc-nd/4.0/

dc.subject

interconnection

dc.subject

energy

dc.subject

demand

dc.subject

climate

dc.subject

policy

dc.subject

renewable

dc.title

Flexible Interconnection: A Policy Solution to Meet U.S. Energy and Climate Needs

dc.type

Master's project

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Flexible Interconnection. Policy. 4.20.26.Final.pdf
Size:
1.16 MB
Format:
Adobe Portable Document Format