Alternatives to Doing a Dam Thing
Abstract
Population projections for the City of Raleigh, NC indicate a shortfall in long-term
raw water supply requirements given current service area demands. Raleigh is proposing
the development of a new reservoir to meet midterm needs; however, the reservoir is
a costly project with relatively short-term returns and is an environmentally sub-optimal
solution. This report proposes four unique adaptive management options to Raleigh’s
existing reservoir, Falls Lake, as alternatives to a new reservoir: Permanent flood
control pool reallocation, dynamic reservoir management, permanent sedimentation pool
reallocation and guide curve flexibility. Considering system risk, costs, ability
to generate additional water supply and environmental impacts, we recommend the combination
of sedimentation pool reallocation and a flexible guide curve be explored to increase
the city’s water supply allocation from Falls Lake. Current static management of water
supply sources is ill equipped to adapt to dynamic climatic conditions and human development
which may lead to increased risk and vulnerability for the communities that rely on
similar reservoirs for municipal water supply and flood control
Type
Master's projectSubject
reallocationflood risk mitigation
active management
adaptive management
water supply
Falls Lake Reservoir
Permalink
https://hdl.handle.net/10161/8557Citation
Kostiuk, Kevin; Mangiante, Mike; & Loveless, Apple (2014). Alternatives to Doing a Dam Thing. Master's project, Duke University. Retrieved from https://hdl.handle.net/10161/8557.Collections
More Info
Show full item record
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 3.0 United States License.
Rights for Collection: Nicholas School of the Environment
Works are deposited here by their authors, and represent their research and opinions, not that of Duke University. Some materials and descriptions may include offensive content. More info