Ellerbe Creek Green Infrastructure Implementation Plan

dc.contributor.advisor

DeMeester, Julie

dc.contributor.advisor

Heffernan, James B

dc.contributor.author

Close, Amanda

dc.contributor.author

Davis, Christina

dc.contributor.author

Williams, Bethany

dc.date.accessioned

2016-04-22T18:12:25Z

dc.date.available

2016-04-22T18:12:25Z

dc.date.issued

2016-04-22

dc.department

Nicholas School of the Environment and Earth Sciences

dc.description.abstract

Ellerbe Creek is a severely degraded urban stream located in Durham, NC. The high percentage of impervious surface within its watershed has contributed to altered hydrology and increased inputs of nitrogen, phosphorus, and other forms of aquatic pollution. This project expands on previous work by the Ellerbe Creek Watershed Association (ECWA) to investigate opportunities for controlling the volume and pollutant load of stormwater runoff using dispersed green infrastructure technologies. A 3-pronged methodology that utilized geospatial analysis, field data collection, and scenario planning using cost-effectiveness optimization was employed to identify and prioritize potential green infrastructure retrofits within a sub-catchment of the watershed. Results of the project equip ECWA with both the data necessary to begin implementing the identified residential retrofits and a tool kit that can be used to expand the analysis to the entire Ellerbe Creek Watershed.

dc.identifier.uri

https://hdl.handle.net/10161/11839

dc.language.iso

en_US

dc.subject

Green Infrastructure

dc.subject

Stormwater

dc.subject

Ellerbe Creek

dc.subject

rain gardens

dc.subject

watershed planning

dc.subject

GIS

dc.title

Ellerbe Creek Green Infrastructure Implementation Plan

dc.type

Master's project

duke.embargo.months

0

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
MP_Final_EllerbeCreek.pdf
Size:
9.79 MB
Format:
Adobe Portable Document Format
Description:
Ellerbe Creek Green Infrastructure Implementation Plan