FIRST ORDER ESTIMATES OF THE POTENTIAL ELECTRIC POWER GENERATION CAPACITY AND ASSOCIATED IMPACTS OF WIDESPREAD COMMERCIAL P.V. SOLAR BUILD OUT IN NORTH CAROLINA
Date
2017-04-24
Authors
Advisors
Journal Title
Journal ISSN
Volume Title
Repository Usage Stats
views
downloads
Abstract
This study uses regional commercial building stock survey data and simulated year-long generation data to determine both the potential capacity and expected grid impact of varying levels of commercial solar PV penetration in the Duke Energy’s DEP and DEC service territories. It estimates the potential utility cost savings and broader economic impact to the commercial sector and provides a data-driven perspective on the benefits and costs of commercial-scale solar in North Carolina to customers and the utility. The results indicate that positive post-financing NPV project are available for all but two identified commercial sectors, suggest innovative financing strategies can broaden adoption to less creditworthy customers and discuss the implications for future grid management and optimization efforts.
Type
Description
Provenance
Citation
Permalink
Citation
Winkler, Louis (2017). FIRST ORDER ESTIMATES OF THE POTENTIAL ELECTRIC POWER GENERATION CAPACITY AND ASSOCIATED IMPACTS OF WIDESPREAD COMMERCIAL P.V. SOLAR BUILD OUT IN NORTH CAROLINA. Master's project, Duke University. Retrieved from https://hdl.handle.net/10161/14069.
Collections
Except where otherwise noted, student scholarship that was shared on DukeSpace after 2009 is made available to the public under a Creative Commons Attribution / Non-commercial / No derivatives (CC-BY-NC-ND) license. All rights in student work shared on DukeSpace before 2009 remain with the author and/or their designee, whose permission may be required for reuse.